In PM project completes in 2 minutes. The same project in ZenoPoster takes 40 minutes and counting. I am looking at action that takes 10 sec in PM for 5 minutes in ZP and it still isn't complete.
Is it possible for this software to work the same in PM and Poster and how?
Is it possible for this software to work the same in PM and Poster and how?