- Регистрация
- 20.03.2011
- Сообщения
- 232
- Благодарностей
- 28
- Баллы
- 28
I've problem with manage my tasks.
I have two independent tasks. Every task with some templates.
First task need many threads to work(directory submitter).
Second task must has only one thread not more (there is many templates but only one template active).
Now I have problem because I must switch off first task and reduce active threads zennoposter from 10 to 1 and stop first task and start second task. How I can do it without manual setting. Is any possible set max active threads limit for task?
I have two independent tasks. Every task with some templates.
First task need many threads to work(directory submitter).
Second task must has only one thread not more (there is many templates but only one template active).
Now I have problem because I must switch off first task and reduce active threads zennoposter from 10 to 1 and stop first task and start second task. How I can do it without manual setting. Is any possible set max active threads limit for task?