Hi !

i want to plan execution of several templates with task manager with parameters illustated in the sceernshot below.

83533


83537


83538


It works time to time and make errors by executing some templates more than 1 time.
And sometimes won't stop at all even closing manually by uncheking it or on instances preview by right click and "close".
Did i miss something?, please Help me.
 

VladZen

Administrator
Команда форума
Регистрация
05.11.2014
Сообщения
22 453
Благодарностей
5 912
Баллы
113
You should set Attemps count to 0 on settings tab.
Conditions for ending project execution, I would set -1.
 
  • Спасибо
Реакции: mta

mta

Client
Регистрация
12.01.2020
Сообщения
129
Благодарностей
7
Баллы
18

VladZen

Administrator
Команда форума
Регистрация
05.11.2014
Сообщения
22 453
Благодарностей
5 912
Баллы
113
  • Спасибо
Реакции: mta

mta

Client
Регистрация
12.01.2020
Сообщения
129
Благодарностей
7
Баллы
18

mta

Client
Регистрация
12.01.2020
Сообщения
129
Благодарностей
7
Баллы
18
Hello!
I added modifications like you told me above. But still i got executions of templates many times in a row. What can i do to make task manager run in the right way.

:bc::bc::bc::bc::bc::bc::bc:
 

VladZen

Administrator
Команда форума
Регистрация
05.11.2014
Сообщения
22 453
Благодарностей
5 912
Баллы
113
  • Спасибо
Реакции: mta

mta

Client
Регистрация
12.01.2020
Сообщения
129
Благодарностей
7
Баллы
18

VladZen

Administrator
Команда форума
Регистрация
05.11.2014
Сообщения
22 453
Благодарностей
5 912
Баллы
113
  • Спасибо
Реакции: mta

mta

Client
Регистрация
12.01.2020
Сообщения
129
Благодарностей
7
Баллы
18
Hi ,
i deleted the looping template among the batch. And the task manager seems to load others correctly but now, i 'am facing problem about condition of execution. i plan one after another with pause (5 to 10 min). But the task manager is executing them WITHOUT pause.

83753


83754
 

VladZen

Administrator
Команда форума
Регистрация
05.11.2014
Сообщения
22 453
Благодарностей
5 912
Баллы
113
Hi ,
i deleted the looping template among the batch. And the task manager seems to load others correctly but now, i 'am facing problem about condition of execution. i plan one after another with pause (5 to 10 min). But the task manager is executing them WITHOUT pause.

Посмотреть вложение 83753

Посмотреть вложение 83754
How long is your project executed?
Schedule means pause between start time of each execution, not between previous execution end and next run start.
It's not possible to calculate when execution ends. So, you should increase pause time taking into account average project execution time
 
  • Спасибо
Реакции: mta

mta

Client
Регистрация
12.01.2020
Сообщения
129
Благодарностей
7
Баллы
18
How long is your project executed?
Schedule means pause between start time of each execution, not between previous execution end and next run start.
It's not possible to calculate when execution ends. So, you should increase pause time taking into account average project execution time
I will do this morning.
But unfortunetly in second batch attemp, many templates start looping although i set the correct parameters in " conditions for ending projects". They didn't stop until i delete them from the list on Task manager.
:ay::ay::ay: !
 

mta

Client
Регистрация
12.01.2020
Сообщения
129
Благодарностей
7
Баллы
18
appreciate your help, See you soon !
 

mta

Client
Регистрация
12.01.2020
Сообщения
129
Благодарностей
7
Баллы
18
How long is your project executed?
Schedule means pause between start time of each execution, not between previous execution end and next run start.
It's not possible to calculate when execution ends. So, you should increase pause time taking into account average project execution time
i adjusted range between executions with much more delay. But templates still loading when failing to execute, instead of switching to the next template on the list of the task manager. I 'am going crazy ! i need this stuff to manage schedule, please help guys !
 
Последнее редактирование:

VladZen

Administrator
Команда форума
Регистрация
05.11.2014
Сообщения
22 453
Благодарностей
5 912
Баллы
113
i adjusted range between executions with much more delay. But templates still loading when failing to execute, instead of switching to the next template on the list of the task manager. I 'am going crazy ! i need this stuff to manage schedule, please help guys !
I think more details needed..